---
title: "Issue 11"
canonical: "https://anchor.is/the-hysteresis/issue/11"
publication: "The Hysteresis"
publisher: "The Hysteresis"
language: "en-US"
guide: "https://anchor.is/the-hysteresis/llms.txt"
permalink: "https://anchor.is/the-hysteresis/issue/11"
issue: 11
description: "The world's largest cell maker doubled its finished goods inventory in six months while running 95% utilization. RMB 47.6 billion in unsold product, backed by RMB 372 billion in cash. We kept returning to that because it changes what the flat cell price tape means. The surplus is growing at twice last year's rate industry-wide, and the entity holding the largest share has no financial reason to move it on anyone else's timeline. The price looks stable. Underneath it is a holder choosing when to release, with the balance sheet to choose slowly. This issue is about what that tape leaves out."
authors: ["Elise Huan-Cartwright","Ronan Adike"]
published: 2026-08-24
updated: 2026-08-22
articles: 94
---

# The Hysteresis

> The Hysteresis exists to give a small cross-functional team — strategy, investment, and procurement — a shared weekly instrument for reading the battery supply chain earlier than consensus. Success means the team consistently identifies inflection points in cell pricing, supplier health, and policy enforcement weeks or months before they surface in earnings calls, annual surveys, or trade press. The commercial mechanism is internal-first: the publication proves itself as a decision tool inside the organization, then extends to paid subscribers and a practitioner community as upside. Revenue follows utility — if the team makes better-timed procurement calls and competitive assessments because of what they read here, the publication earned its place.

[Read on the website](<https://anchor.is/the-hysteresis/issue/11>)

## Issue 11

The world's largest cell maker doubled its finished goods inventory in six months while running 95% utilization. RMB 47.6 billion in unsold product, backed by RMB 372 billion in cash. We kept returning to that because it changes what the flat cell price tape means. The surplus is growing at twice last year's rate industry-wide, and the entity holding the largest share has no financial reason to move it on anyone else's timeline. The price looks stable. Underneath it is a holder choosing when to release, with the balance sheet to choose slowly. This issue is about what that tape leaves out.

### [Signal](<https://anchor.is/the-hysteresis/issue/11/signal/markdown>)

The numbers, their velocity, and what moves next

- **Weekly Rate Accelerates to Plus Five Percent** — [Source](<https://www.infolink-group.com/energy-article/ess-spot-price-20260819>) — Published 2026-08-21

InfoLink battery-grade lithium carbonate: RMB 140,000/MT (August 5) to RMB 149,000/MT (August 19). Week-on-week sequence: -2.8%, +1.1%, +5.3%. Three consecutive weeks of acceleration. InfoLink attributes the move to tight spot availability and delayed supply restoration, not broad demand pull. SC6 spodumene directionally consistent.

- **Fluence Penalty Ratio Jumped to Thirteen Percent** — [Source](<https://www.sec.gov/Archives/edgar/data/1868941/000186894126000029/flnc-20260630.htm>) — Published 2026-08-21

Fluence 10-Q (Q3 FY2026): potential liquidated damages rose from $209.3M to $396.3M QoQ. Minimum purchase commitments grew from $2.640B to $2.913B. LD-to-commitment ratio: 7.9% to 13.6%. Penalties up 89% against commitments up 10%. The asymmetry prices in volume risk the company hasn't yet delivered against.

- **Samsung SDI Positive After Seven Loss Quarters** — [Source](<https://news.samsungsdi.com/global/press/view?seq=440>) — Published 2026-08-21

Samsung SDI posted KRW 203.8B consolidated operating profit in Q2, first positive quarter in seven. LGES reported KRW 113.3B headline profit, but strip out KRW 241B in 45X production incentives and the underlying loss was KRW 127.7B, narrowed from roughly KRW 397.6B in Q1. Neither disclosed a cell ASP.

- **Four Storage RFPs Active No Cleared Prices** — [Source](<https://www.appalachianpower.com/business/b2b/energy-rfps/Energy-Storage-RFPs>) — Published 2026-08-21

Appalachian Power (up to 800 MW, due September 30), Duke Energy Carolinas (~400 MW, bid window open), Illinois Power Agency (1,038 MW indexed-credit, expected August 26), Central Hudson (10+ MW, due September 14). Structures range from asset purchase to indexed credit. No awarded $/kWh published for any.

- **SMM Retiring Three Pack Price Series August 28** — [Source](<https://news.smm.cn/gonggao/104048986>) — Published 2026-08-21

SMM will publish final assessments for its 51.9 kWh prismatic LFP, 18.3 kWh prismatic LFP, and 42.8 kWh NMC pack series on August 28. Pack designs have grown too project-specific to support a representative unified benchmark. Cell-level and battery-cabin assessments continue.

- **ESS Cell Prices Flat Three Consecutive Weeks** — [Source](<https://www-old.metal.com/Battery-Cell-And-Module/202405100003>) — Published 2026-08-21

InfoLink 280Ah and 314Ah LFP ESS cells held at RMB 0.360/Wh (~$53.1/kWh) through August 5, 12, and 19. SMM's 314Ah assessment: RMB 0.366/Wh (~$54.0/kWh), also unchanged. The RMB 6/kWh gap between assessors exceeds the estimated RMB 4.8/kWh lithium cost impulse from the same period.

- **China EV Cell Tape Barely Moved This Week** — [Source](<https://www-old.metal.com/price/New-Energy/Battery-Cell-And-Module>) — Published 2026-08-21

SMM August 21 EV cell table: three of six line items unchanged, three showed moves of $0.30-$0.40/kWh. Range spans $52.6/kWh (100Ah prismatic LFP) to $95.0/kWh (158Ah 8-series prismatic NMC). The table mixes chemistries, formats, and capacities; treat as a composite, not a single market price.

- **China ESS System Assessments Unchanged at Latest Reading** — [Source](<https://www.infolink-group.com/energy-article/ess-spot-price-20260819>) — Published 2026-08-21

InfoLink August 19 averages: 2-hour DC at RMB 0.49/Wh (~$72.3/kWh), 2-hour AC at RMB 0.58/Wh (~$85.5/kWh), 4-hour AC at RMB 0.53/Wh (~$78.2/kWh). All flat versus prior week. PCS, thermal management, BMS, and balance-of-system costs dilute cell-level input moves at the system level.

- [Lithium Carbonate +RMB 9/kg in Two Weeks; Cell Assessments Held Flat](<https://anchor.is/the-hysteresis/issue/11/signal/article/35824/markdown>) — By [Elise Huan-Cartwright](<https://anchor.is/the-hysteresis/team/53/markdown>) · Published 2026-08-21 · Format: The Velocity Synthesis

Lithium carbonate rose RMB 9/kg over two weeks. LFP ESS cell assessments didn't move. The available read is cost absorption, but the implied material-cost sensitivity (~RMB 4.8/kWh) is smaller than the RMB 6/kWh gap between InfoLink's and SMM's midpoints for the same 314 Ah product — absorption and non-arrival produce the same flat print. Separately: SMM withdraws its pack-level price series after August 28, and over 2.2 GW of US storage procurement is active with no public clearing price.

- [What $/kWh Leaves Out](<https://anchor.is/the-hysteresis/issue/11/signal/article/35814/markdown>) — By [Elise Huan-Cartwright](<https://anchor.is/the-hysteresis/team/53/markdown>) · Published 2026-08-21

Fluence's [June 30 10-Q](https://www.sec.gov/Archives/edgar/data/1868941/000186894126000029/flnc-20260630.htm) discloses $396.3M in potential liquidated damages against $2.913B in minimum battery-cell purchase commitments. That LD-to-commitment ratio — approximately 13.6% — was ~7.9% at March 31. A 570-basis-point increase in one quarter. The FY2028 LD tranche ($122.8M) exceeds FY2027 ($111.6M), meaning penalty exposure is forward-loading, not amortizing. Separately, Fluence extended a $30M working-capital loan to an unnamed cell supplier in May and carries $84M in capacity-guarantee advances. Combined supplier financial support: $114M. Gross margin compressed to 5.1% from 14.8% YoY, attributed partly to rising battery prices. These commitments — LDs, advances, supplier credit — sit outside every cell-price benchmark but inside every procurement decision.

- **Lithium Carbonate Up 5.3% in a Week; Chinese LFP Cell Prices Unchanged** — [Source](<https://www.infolink-group.com/energy-article/ess-spot-price-20260819>) — Published 2026-08-21

InfoLink Aug 19 assessment: carbonate costs accelerating with zero cell pass-through yet. Margin compression building.

- **Fluence 10-Q: $2.9B in Cell Purchase Commitments, Liquidated-Damages Exposure Nearly Doubled as Share of Backlog** — [Source](<https://www.sec.gov/Archives/edgar/data/1868941/000186894126000029/flnc-20260630.htm>) — Published 2026-08-21

Q3 filing shows 13.6% penalty exposure and gross margin hit from battery price increases on locked contracts.

- **Samsung SDI Q2: KRW 204B Operating Profit, but Ex-Tariff Refunds the Result Was Marginal** — [Source](<https://news.samsungsdi.com/global/press/view?seq=440>) — Published 2026-08-21

First positive quarter in seven. Management called the ex-policy result "a small profit" on the earnings call.

- **Appalachian Power Issues 800 MW Storage RFPs with Domestic-Content Preference, Due September 30** — [Source](<https://www.appalachianpower.com/business/b2b/energy-rfps/Energy-Storage-RFPs>) — Published 2026-08-21

Two structures: 500 MW equity acquisition, 300 MW capacity purchase. PJM Virginia. Buyer signal worth tracking.

- **LG Energy Solution Q2: KRW 113.3B Reported Operating Profit Includes KRW 241B in North American Incentives** — [Source](<https://lgcorp.com/media/release/30412>) — Published 2026-08-21

Strip the production incentives and core manufacturing economics are KRW 127.7B negative. Second Korean maker policy-dependent.

- **Fastmarkets CIF CJK Lithium Hydroxide Spec Change Takes Effect September 1** — [Source](<https://www.fastmarkets.com/insights/fastmarkets-to-publish-one-time-differential-for-cjk-lithium-hydroxide-derivative-contract/>) — Published 2026-08-21

Quality and tonnage specs shifting on the key seaborne benchmark. Expect a methodology break in the series.

### [China](<https://anchor.is/the-hysteresis/issue/11/china/markdown>)

CATL, BYD, and the market that sets the floor

- [122.3 GWh of Unabsorbed Chinese Battery Production in Seven Months](<https://anchor.is/the-hysteresis/issue/11/china/article/35857/markdown>) — By [Elise Huan-Cartwright](<https://anchor.is/the-hysteresis/team/53/markdown>) · Published 2026-08-21

CABIA's January–July 2026 combined power-and-ESS battery data: production 1,286.9 GWh, sales 1,164.6 GWh. The gap is 122.3 GWh, 10.5% of reported sales. Full-year 2025's production-sales difference was 55.1 GWh, 3.2% of sales. Seven months into 2026, the residual has more than doubled the prior year's total.

- [Chinese Cell Prices Move in Pools](<https://anchor.is/the-hysteresis/issue/11/china/article/35859/markdown>) — By [Elise Huan-Cartwright](<https://anchor.is/the-hysteresis/team/53/markdown>) · Published 2026-08-21 · Format: The Structural Map

InfoLink's China ESS cell series has printed RMB 0.360/Wh since February. InfoLink's own analysis says 314 Ah prices rose more than 15% over the same period. Both can be true, because they measure different pools — separated by qualification gates, format requirements, and deployment-history thresholds that keep 122.3 GWh of surplus production from flowing where it would compress prices. Two axes organize the system: who can carry surplus and for how long, and which price pools that surplus can reach. The spot floor everyone watches is real, and it carries the least information relevant to a qualified procurement decision.

- [CATL Doubled Its Finished Goods in Six Months. Dispatched Goods Barely Moved.](<https://anchor.is/the-hysteresis/issue/11/china/article/35858/markdown>) — By [Elise Huan-Cartwright](<https://anchor.is/the-hysteresis/team/53/markdown>) · Published 2026-08-21 · Format: Leader Carry Case

CATL's net finished goods rose 111% to RMB 47.6B in H1 2026. Goods dispatched grew 4.7%. Contract liabilities fell 26%. Utilization held at 94.86%. A producer sitting on RMB 372B in monetary funds can carry that surplus indefinitely without discounting, and the near-flat inventory provision means its auditors agree the product moves at cost or better. What that combination points to for buyers is leverage on terms, commitments, and delivery structure rather than on headline price.

- **Paired SMM InfoLink Reads Show No Renewed Deflation** — [Source](<https://www-old.metal.com/price/New-Energy/Battery-Cell-And-Module>) — Published 2026-08-21

SMM August 21 LFP EV cells: $52.6–52.9/kWh (+$0.3 WoW). ESS 314 Ah: $47.4/kWh (+$0.2 WoW). InfoLink 280/314 Ah ESS flat at RMB 0.360/Wh through August 5–19. Different methodologies, transaction bases, and assessment dates. Neither confirms sustained tightening or renewed deflation.

- **Lithium Carbonate Up 6.4 Percent Cells Still Flat** — [Source](<https://www.infolink-group.com/energy-article/ess-spot-price-20260819>) — Published 2026-08-21

InfoLink battery-grade lithium carbonate: RMB 140,000 to RMB 149,000/MT over August 5–19 (+6.4%). ESS cells held at RMB 0.360/Wh throughout. Direct cost impulse estimated at roughly RMB 0.0046/Wh under standard LFP sensitivity. Iron phosphate rising simultaneously to approximately RMB 14,500–15,000/MT. Neither input has passed through.

- **Unabsorbed Production Already Doubles the Full 2025 Gap** — [Source](<https://finance.sina.com.cn/stock/hkstock/ggscyd/2026-08-18/doc-ininthzt7393919.shtml>) — Published 2026-08-21

New metric. CABIA Jan–Jul 2026: output 1,286.9 GWh vs. sales 1,164.6 GWh, a 122.3 GWh gap (10.5% of sales), already exceeding full-year 2025's 55.1 GWh. July: 32.8 GWh gap at 17.7% of monthly sales. Output grew MoM while exports and installations fell. Label as unabsorbed reported production, not verified inventory.

- **CATL at 94.9 Percent Utilization Finished Goods Doubled** — [Source](<https://vip.stock.finance.sina.com.cn/corp/view/vCB_AllBulletinDetail.php?id=12462543>) — Published 2026-08-21

H1 2026: utilization 94.86% (+5.00 pp YoY), capacity 525 GWh, 764 GWh under construction. Finished goods doubled to RMB 47.6B while dispatched goods grew 5.3%. Contract liabilities fell 25.9% to RMB 36.5B. Liquidity RMB 440.2B. Power-battery margin 20.63% (-1.78 pp YoY). Production is running ahead of sell-through.

- **CATL Plus BYD Hold 61.6 Percent in July** — [Source](<https://cnevpost.com/2026/08/18/top-battery-makers-share-china-jul-2026/>) — Published 2026-08-21

July domestic EV installations: CATL 42.33% (+1.14 pp MoM), BYD 19.23% (+0.74 pp MoM). Combined 61.56%. Top-5 at 80.85%. Domestic EV concentration edged higher while InfoLink's global ESS CR10 fell from 91.2% to 82.3% in H1 2026. Different applications and geographies, not contradictory.

- **GB 38031 Sampling Confirmed No Outcomes Published Yet** — [Source](<https://www.miit.gov.cn/jgsj/zbys/qcgy/art/2026/art_3f42fd84171c46f9af3f8f79d324601d.html>) — Published 2026-08-21

GB 38031-2025 effective July 1, 2026. MIIT inspected GAC Aion and Zhaoqing XPeng on July 24, sampling vehicles and traction batteries for conformity testing. No test results, battery-supplier identities, failures, or penalties published. Enforcement has advanced from rule text to physical sampling but not to disclosed outcomes.

- **Three Export Control Clocks Two Approaching November Expiry** — [Source](<https://www.mofcom.gov.cn/zfxxgk/fdzdgknr/ztfl/blgg/art/2025/art_d88813e2380b4ee9b770974bac57d3ec.html>) — Published 2026-08-21

Announcement 58 (cells above 300 Wh/kg, equipment, technology): suspended through November 10, 2026. Enhanced US-specific review (Announcement 72): suspended through November 27, 2026. Permanent graphite licensing (Announcement 39): active now. No public data on license grants or denials under any regime. No extension announced for either suspension.

- **September 1 Battery Consumption Tax Creates Price Break** — [Source](<https://fgk.chinatax.gov.cn/zcfgk/c102416/c5251171/content.html>) — Published 2026-08-21

2% consumption tax on lithium-ion batteries effective September 1, rising to 4% in September 2027. Sodium-ion and solid-state exempt through 2028. Cell-to-pack deduction permitted with qualifying documents; purchased finished packs denied deduction. Post-September 1 invoice prices and pre-tax producer netbacks diverge. Watch August volumes for pre-tax positioning.

- **CRU: China's Overcapacity — Will Its Battery Industry Consolidate?** — [Source](<https://www.crugroup.com/en/communities/thought-leadership/2025/chinas-overcapacity-will-its-battery-industry-consolidate/>) — Published 2026-08-21

Best English-language structural analysis of provincial incentives sustaining 2 TWh+ capacity against ~60% utilization. Free access.

- **InfoLink: H1 2026 ESS Cell Shipments and Concentration Data** — [Source](<https://www.pv-magazine.com/2026/08/17/energy-storage-cell-shipment-data-for-h1-2026-reveal-three-structural-shifts/>) — Published 2026-08-21

468 GWh shipped, CR10 still declining, 314 Ah tightening, 500 Ah format crossing 10% penetration. Via PV Magazine.

- **InfoLink Weekly Spot Pricing: LFP Cell, ESS System, Lithium Carbonate (Aug 19)** — [Source](<https://www.infolink-group.com/energy-article/ess-spot-price-20260819>) — Published 2026-08-21

Lithium carbonate up 5.3% WoW; LFP cell and containerized system prices flat. The weekly pricing anchor.

- **CnEVPost: China Power Battery Installations, July 2026 (CABIA Data)** — [Source](<https://cnevpost.com/2026/08/18/china-power-battery-installations-jul-2026/>) — Published 2026-08-21

Full CABIA relay: 33.5% YoY installation growth, LFP at record 84.6% share. Monthly tables back to 2020.

- **CnEVPost: July 2026 Supplier Market Share (CABIA Data)** — [Source](<https://cnevpost.com/2026/08/18/top-battery-makers-share-china-jul-2026/>) — Published 2026-08-21

CATL 42.3%, BYD 19.2%, top 5 at 80.9%. Supplier-level installation data with MoM share shifts across top 15.

- **CATL H1 2026 Filing (Sina Finance, Chinese-Language Primary)** — [Source](<https://vip.stock.finance.sina.com.cn/corp/view/vCB_AllBulletinDetail.php?id=12462543>) — Published 2026-08-21

Shenzhen-exchange filing: 94.9% utilization, RMB 277B revenue, segment-level margin detail. Key figures cited in our coverage.

### [Korea](<https://anchor.is/the-hysteresis/issue/11/korea/markdown>)

LG, Samsung, SK — beyond the headlines

- **LGES Still Loss-Making Before Production Credits** — [Source](<https://www.lgensol.com/upload/file/irEvent/26_2Q_LGES_business_performance_F_EN.pdf>) — Published 2026-08-21

Revenue KRW 7.56T, reported operating profit KRW 113.3B. Strip KRW 241.0B in North American production incentives and the underlying result was KRW -127.7B. That's better than Q1's roughly KRW -397.6B ex-incentive loss, but the manufacturing business remains unprofitable on its own.

- **Lansing SOP August 18 LFP Split Unknown** — [Source](<https://lgcorp.com/media/release/30470>) — Published 2026-08-21

Production started August 18 at Lansing, Michigan: LFP cells for ESS and NMC for Toyota, with target capacity above 35 GWh across both chemistries. LGES has not disclosed the LFP-NMC line allocation, yield data, or customer-accepted volumes. Argus confirmed no split was provided.

- **Samsung SDI Battery Segment Profits, Support Unclear** — [Source](<https://news.samsungsdi.com/global/press/view?seq=440>) — Published 2026-08-21

Battery segment operating profit KRW 159.3B, the first positive quarter in seven. Consolidated result includes KRW 107.7B AMPC plus an undisclosed tariff refund. Earnings call: "excluding the impact of tariffs, a small profit was recorded." The manufacturing-only result cannot be isolated from public disclosure. Scope and utilization context in the sidebar.

- **Samsung Display Stake Sale Funds New Carlisle** — [Source](<https://www.koreatimes.co.kr/business/companies/20260821/samsung-sdi-to-sell-samsung-display-stake-for-32-bil-to-fund-investments>) — Published 2026-08-21

Announced today: Samsung SDI will sell 13.09M Samsung Display shares for KRW 4.45T (~$3.2B), closing August 27. Proceeds tagged for "future growth engine investments." The likely destination is the 27 GWh New Carlisle plant, now wholly owned after Samsung SDI completed its GM buyout on August 11.

- **SK On Posts KRW 821.8B Profit, Drivers Unquantified** — [Source](<https://www.skinnovation.co.kr/ir/earning/277?fileType=callFile>) — Published 2026-08-21

Battery revenue KRW 2.95T, operating profit KRW 821.8B versus Q1's KRW -349.2B loss. SK Innovation cited higher Asian sales, one-time customer compensation, and increased AMPC. None quantified separately in public materials. Full Q2 decomposition in this week's feature.

- **Korean Makers Lose Share in Growing Market** — [Source](<https://www.sneresearch.com/en/insight/release_view/709/page/0>) — Published 2026-08-21

SNE Research H1 2026: non-China xEV battery usage up 26.3% YoY to 269 GWh. Korean combined share dropped from 37.2% to 27.6%. LGES 16.7% (from 20.7%), SK On 7.0% (from 9.5%), Samsung SDI 3.9% (from 7.0%). All three declined YoY in a market that grew by a quarter.

- **Korean Production Credit Proposed, Cash Access Missing** — [Source](<https://www.koreajoongangdaily.com/korea/make-it-here-pay-less-tax-govt-unveils-production-credit-for-chips-batteries/12805902>) — Published 2026-08-21

Korea's August 3 tax reform plan proposes a 10-year domestic production credit for secondary batteries. The structural gap: no direct pay or credit transfer provision. Loss-making companies cannot monetize it as cash. Requires National Assembly approval, not enacted as of August 21.

- **Three ESS Sites Running, No Acceptance Data Yet** — [Source](<https://www.samsungsdi.com/sdi-now/sdi-news/4822.html>) — Published 2026-08-21

LGES has started production at Lansing, Jeffersonville (Ohio), and Spring Hill. Samsung SDI runs NCA ESS at StarPlus with LFP targeted for Q4. SK On targets H2 2026 LFP at Commerce, Georgia. No facility has disclosed customer-accepted ESS run-rate or sustained commercial output volumes.

- [SK On Q2 2026 — More Solvent, Not Demonstrably Healthier](<https://anchor.is/the-hysteresis/issue/11/korea/article/35841/markdown>) — By [Ronan Adike](<https://anchor.is/the-hysteresis/team/74/markdown>) · Published 2026-08-21 · Format: The Earnings Decomposition

SK On reported KRW 821.8 billion in Q2 operating profit at 36.4% utilization. Those numbers cannot coexist unless non-manufacturing income dominated the quarter. The company names three contributors — increased AMPC, a one-time customer compensation, higher Asian volume — and quantifies none of them. Ford's Q2 10-Q separately records a $0.5 billion dissolution-related settlement that is temporally coincident and roughly the right magnitude, though neither filing connects the two. The recurring manufacturing result, calculable through Q4 2025 and worsening, is no longer isolable. This decode works the four profit layers, maps the 94.3 GWh capacity stock against 45X and FEOC eligibility, and tests which ESS gates SK On has actually crossed.

- [Samsung SDI's 73% Utilization Applies to Small Batteries Only](<https://anchor.is/the-hysteresis/issue/11/korea/article/35825/markdown>) — By [Ronan Adike](<https://anchor.is/the-hysteresis/team/74/markdown>) · Published 2026-08-21

Samsung SDI's H1 2026 [DART filing](https://dart.fss.or.kr/report/viewer.do?rcpNo=20260814003578&dcmNo=11537677&eleId=12&offset=149138&length=27018&dtd=dart4.xsd) (August 14) discloses 73% capacity utilization — 860 million units produced against 1.178 billion unit capacity. The scope is small-battery facilities only: Cheonan and Tianjin consumer cell plants ([Edaily](https://en.edaily.co.kr/news/eda202608145759/), August 14, reporting directly from the filing). The full-year 2025 figure of 50.4% covered the same small-battery scope. The filing provides no utilization figure for medium- and large-format EV or ESS operations.

- **SK On Posts KRW 822B Operating Profit in Q2 — One-Off Compensation and AMPC Account for the Swing** — [Source](<https://www.skinnovation.co.kr/ir/earning/277?fileType=callFile>) — Published 2026-08-21

Profit reversal driven by non-recurring items; none of the three named Q2 drivers is individually quantified.

- **SK On H1 2026 Utilization Falls to 36.4% — Scope and Methodology Changes Complicate the Comparison** — [Source](<https://zdnet.co.kr/view/?no=20260815040828>) — Published 2026-08-21

DART filing shows sharp utilization drop, but JV dissolution altered the denominator and calculation method.

- **SK On's Flatiron ESS Deal: 1 GWh Firm, 6.2 GWh Right of First Offer — Not 7.2 GWh Contracted** — [Source](<https://www.koreaherald.com/article/10568646>) — Published 2026-08-21

Korea Herald preserves the structural distinction most trade press headlines obscure in the Flatiron contract.

- **Korean Battery Trio Loses 9.6 Percentage Points of Non-China xEV Share in H1 2026** — [Source](<https://www.sneresearch.com/en/insight/release_view/709/page/0>) — Published 2026-08-21

SNE Research data: LGES barely grew, SK On shrank, Samsung SDI fell 29% YoY as Chinese makers gained.

- **Samsung SDI's 73% Utilization Rebound Covers Small Batteries Only — EV/ESS Rate Still Undisclosed** — [Source](<https://en.edaily.co.kr/news/eda202608145759/>) — Published 2026-08-21

Edaily's DART-based report is a scope trap: the recovery is in consumer cells, not sourcing-relevant segments.

- **Samsung SDI Returns to Profit After Seven Quarters — AMPC and Tariff Refunds Remain Unquantified** — [Source](<https://news.samsungsdi.com/global/press/view?seq=440>) — Published 2026-08-21

Battery segment earned KRW 159.3B, but underlying margin without US incentives and refunds is unclear.

### [The Log](<https://anchor.is/the-hysteresis/issue/11/the-log/markdown>)

What was announced, built, and cancelled

- [LG Lansing Moves to Declared Production — LFP ESS Only](<https://anchor.is/the-hysteresis/issue/11/the-log/article/35804/markdown>) — By [Elise Huan-Cartwright](<https://anchor.is/the-hysteresis/team/53/markdown>) · Published 2026-08-21

LG Energy Solution [declared production](https://inside.lgensol.com/en/2026/08/lg-energy-solution-announces-start-of-production-at-all-new-lansing-battery-plant/) at Lansing on August 18. The declaration covers LFP cells for energy storage, routed through Vertech, LG's internal US ESS integration division. NMC cells for Toyota's 2027 Highlander EV appear in future tense in the release — production is not claimed.

- [LG Energy Solution Lansing — From 50 GWh Announced to 35+ GWh Declared](<https://anchor.is/the-hysteresis/issue/11/the-log/article/35806/markdown>) — By [Elise Huan-Cartwright](<https://anchor.is/the-hysteresis/team/53/markdown>) · Published 2026-08-21 · Format: The Stated vs. Observed Audit

LG Energy Solution declared production at Lansing on August 18. The facility is real, staffed with approximately 900 employees, and making cells. Over the same period the headline capacity moved three times — 50 GWh to 41 GWh to "more than 35 GWh" — with no published explanation, and the chemistry and customer base changed completely. This audit traces every stated milestone against observable evidence, from the 2022 GM-LG announcement through JV dissolution, acquisition, and SOP, and identifies what remains undisclosed for teams evaluating Lansing as contractable domestic supply.

- [Registry Update Batch — Week of August 21, 2026](<https://anchor.is/the-hysteresis/issue/11/the-log/article/35805/markdown>) — By [Elise Huan-Cartwright](<https://anchor.is/the-hysteresis/team/53/markdown>) · Published 2026-08-21 · Format: Registry Updates

Seven registry updates. Two matter for supply planning: EnerSys filed a 75–80% capacity cut at Greenville, pulling 3–4 GWh out of the US cell pipeline, and Samsung SDI's purchase of GM's New Carlisle stake sits in a gap between the English release and the Korean regulatory filing that no closing document has resolved. Warren recalled its workforce but has not verified recurring production; Forge Nano's SEC registration filing is the most informative disclosure in the batch, with an executed DOE assistance agreement, active reimbursement drawing, and a named Samsung SDI offtake carrying partial commercial terms.

- [Lansing Is Producing. The 45X Credit Trail Still Ends at the Company Level.](<https://anchor.is/the-hysteresis/issue/11/the-log/article/35807/markdown>) — By [Ronan Adike](<https://anchor.is/the-hysteresis/team/74/markdown>) · Published 2026-08-21 · Format: Policy Ledger

LG Energy Solution started production at Lansing on August 18, adding another eligible facility to a 45X disclosure that has never been broken out below the company level. The related-party election governs when credits attach on affiliated transactions and says nothing about whether that value reaches a cell price. BIS now requires domestic retention of black mass without connecting the requirement to any tax-credit or FEOC regime. Three developments at three points in the credit chain, and the same gap between what the implementation architecture defines and what the public record actually discloses.

- **LGES Lansing: Electrive Names Tesla LFP Contract ($4.3B, Megapack 3 Link) and Toyota NMC for Highlander — Neither Confirmed in Company Press Release** — [Source](<https://www.electrive.com/2026/08/19/lg-energy-solution-launches-battery-production-in-lansing/>) — Published 2026-08-21

Tier 2 source adds customer detail LGES omitted; Toyota NMC line not yet producing.

- **LGES Lansing SOP Declared 2026-08-18: LFP for ESS, Vertech and DTE Named as Customers, No Output Volume Disclosed** — [Source](<https://www.prnewswire.com/news-releases/lg-energy-solution-announces-start-of-production-at-all-new-lansing-battery-plant-302853726.html>) — Published 2026-08-21

Tier 1 source confirms production start; omits Tesla, Toyota, capacity utilization, and line count.

- **LGES Warren: 1,400 Workers Recalled After Seven-Month Shutdown; System-Wide Utilization 52.8% in H1 2026** — [Source](<https://finance.biggo.com/news/491df896-9f6d-487c-99e5-1ff3f0c96bab>) — Published 2026-08-21

Reuters confirms workforce return; no demonstrated output data for Warren post-restart.

- **LGES Holland: 16.5 GWh Nameplate, Three Lines Installed, Two Operational as of Mid-2025 — Eight-Facility US Footprint Noted** — [Source](<https://www.batterytechonline.com/battery-manufacturing/lg-energy-solution-opens-first-us-large-scale-lfp-battery-plant-for-energy-storage>) — Published 2026-08-21

Battery Technology plant profile provides line-level detail absent from LGES disclosures.

- **Nikkei: Lansing Characterized as Long-Delayed, Repositioned from GM EV Joint Venture Origin to ESS-Focused LGES Solo Operation** — [Source](<https://asia.nikkei.com/business/technology/lg-energy-solution-opens-us-battery-hub-serving-toyota-and-tesla>) — Published 2026-08-21

Frames Lansing pivot as response to slowing EV demand; useful context on facility lineage.

- **PV Magazine: LGES Claims Lansing Cells Satisfy US Domestic Content Requirements; No 45X or MACR Filing Detail Disclosed** — [Source](<https://pv-magazine-usa.com/2026/08/19/lg-energy-solution-starts-battery-production-at-new-lansing-facility/>) — Published 2026-08-21

Notes 80% North American ESS capacity target; content claim unverified against Treasury criteria.

### [Defense](<https://anchor.is/the-hysteresis/issue/11/defense/markdown>)

Drone, UAV, UUV, and 6T battery intelligence

- [DLA Lithium Stockpile Solicitation Cancelled After Cobalt Repeat](<https://anchor.is/the-hysteresis/issue/11/defense/article/35786/markdown>) — By [Elise Huan-Cartwright](<https://anchor.is/the-hysteresis/team/53/markdown>) · Published 2026-08-21

DLA [cancelled its $300M lithium carbonate solicitation](https://insidedefense.com/insider/pentagon-still-plans-lithium-purchases-after-canceling-tender-300-million-worth) on August 3 after twice extending the bid deadline. The five-year IDIQ sought 16,170 MT of battery-grade material for the National Defense Stockpile. DLA's language — "reevaluating its acquisition strategy," requirement still valid, no reissue date — matches the phrasing it used after [cancelling the $500M cobalt tender](https://www.indexbox.io/blog/us-cancels-500-million-cobalt-tender-over-contract-issues/) last October. Neither has been reissued.

- [The Mandate Gap — August Signal Cluster](<https://anchor.is/the-hysteresis/issue/11/defense/article/35796/markdown>) — By [Elise Huan-Cartwright](<https://anchor.is/the-hysteresis/team/53/markdown>) · Published 2026-08-21 · Format: The Mandate Gap

Seven signals in two weeks, the densest defense-battery cluster since DDP's supply-chain framework landed in July. Forge Nano broke ground on a planned 3 GWh facility. Sila took a $1.4 billion conditional loan from the Office of Strategic Capital. DFARS Case 2024-D011 slipped to October, and Section 232 duties hit complete UAS while leaving standalone cells outside the perimeter. All of that sits in capital formation and mandate infrastructure. The compliance-evidence layer that would tie either to qualified supply returned nothing on any public route checked through August 21, with 498 days left on the January 2028 deadline.

- [The Option the Supplier Writes for Free](<https://anchor.is/the-hysteresis/issue/11/defense/article/35797/markdown>) — By [Elise Huan-Cartwright](<https://anchor.is/the-hysteresis/team/53/markdown>) · Published 2026-08-21 · Format: Demand Structure

NDAA Section 842 mandates non-FEOC battery procurement. Section 4817 authorizes ten-year purchase commitments that would guarantee the demand justifying supplier investment. The §4865 waiver lets DoD bypass the mandate when compliant supply is insufficient. As of August 2026 the mandate is active, the purchase authority shows no battery commitment in the public record, and the waiver is available. A supplier can price the one-to-three-year, multimillion-dollar qualification cost precisely. What it cannot locate is a binding volume on the other side, which makes deferral rational, which keeps compliant supply short, which keeps the waiver available.

- **Drone Dominance Framework Sets Dated Battery Gates** — [Source](<https://www.dronedominance.mil/assets/DDP%20Supply%20Chain%20Framework_Version%202%20%2823%20July%2026%29.pdf>) — Published 2026-08-21

The July 23 Supply Chain Framework (Version 2) converts §4865 into program-specific sourcing steps. Pack assembly outside covered countries required by August 2026; cells from outside covered countries and §842-compliant by August 2027, six months ahead of the statutory new-program date. Applies to Drone Dominance Phases II–IV only.

- **DFARS Battery Rulemaking Slips Again, No NPRM Published** — [Source](<https://www.reginfo.gov/public/do/eAgendaViewRule?RIN=0750-AM08&pubId=202510>) — Published 2026-08-21

DFARS Case 2024-D011 internal report deadline moved to October 7, 2026. Federal Register searches through August 19 returned no NPRM or interim rule. Cumulative schedule slip from the original December 2024 target: 19 months. Contractor representations, cost methodology, technology-license certification, and flowdown treatment all remain unpublished.

- **UAS Tariff Proclamation Cites Battery Supply Dependency** — [Source](<https://public-inspection.federalregister.gov/2026-16979.pdf>) — Published 2026-08-21

Proclamation 11055 (August 19) imposes additional tariffs on specified UAS and components from September 3, with a February 2027 date for parts. Lithium-ion batteries cited as a supply-chain dependency. Blue UAS suppliers get a 180-day delayed effective date. Cell-level HTS classification treatment remains ambiguous from the proclamation text.

- **DoD Battery Strategy Report Due in Forty Days** — [Source](<https://www.congress.gov/118/plaws/publ31/PLAW-118publ31.htm>) — Published 2026-08-21

The FY2025 NDAA-directed DoD-wide battery strategy, covering procurement alignment, standardization, raw-material obstacles, and rapid certification, is due to the Armed Services committees by September 30. No draft or preliminary findings have surfaced publicly. The question worth tracking: whether it aggregates actual demand figures or catalogs taxonomy.

- **Forge Nano Breaks Ground, Production Starts in 2028** — [Source](<https://www.bizjournals.com/triangle/news/2026/08/19/forge-nano-breaks-ground-morrisville-battery-plant.html>) — Published 2026-08-21

Forge Nano broke ground August 19 on the 3 GWh/year Morrisville, NC facility with Samsung SDI. Production start is 2028 per the June SEC filing, 18–24 months behind the original DOE projection of 2026. Samsung's cell purchase agreement remains conditional. No DoW contract, QPL entry, or §4865 compliance file disclosed.

- **DLA Cancels $300M Lithium Carbonate Stockpile Tender** — [Source](<https://nges.insidedefense.com/insider/pentagon-still-plans-lithium-purchases-after-canceling-tender-300-million-worth>) — Published 2026-08-21

DLA cancelled solicitation SP8000-26-R-0021 for up to 35.6 million pounds of battery-grade lithium carbonate over five years after twice extending the bid deadline. A Pentagon official told Inside Defense the requirement remains valid but gave no reissue date. The upstream procurement route has effectively reset.

- **DIBC Battery Solicitation Closed With No Award** — [Source](<https://www.dibconsortium.org/solicitations-2/>) — Published 2026-08-21

The DIBC RPP-BES-26-01 solicitation, seeking at least 50 MWh/year within two years and a 3 GWh/year objective, showed "Closed" as of August 12 rather than "Awarded." Award depended on FY2027 appropriations. A government purchase floor for defense battery capacity still does not exist.

- **Sila Gets $1.4B Conditional Loan From OSC** — [Source](<https://www.war.gov/News/Releases/Release/Article/4566579/the-office-of-strategic-capital-signs-14-billion-conditional-loan-commitment-wi/>) — Published 2026-08-21

OSC announced a $1.4 billion conditional loan commitment on August 7 for expanded silicon-carbon anode production and a lithium-ion cell facility. DoW named UAS and munitions among intended applications. Financial close, GWh target, commissioning date, platform specifics, offtake quantity, and §4865 compliance package all remain undisclosed.

- **Forge Nano Breaks Ground on 3 GWh Defense Gigafactory; SOP Quietly Slips to 2028** — [Source](<https://www.globenewswire.com/news-release/2026/08/19/3347836/0/en/forge-nano-breaks-ground-on-america-s-battery-gigafactory-to-strengthen-u-s-defense-supply-chains.html>) — Published 2026-08-21

Samsung SDI co-production and $100M DOE grant anchor the project. Two-year schedule slip is the signal.

- **Section 232 Drone Tariffs Reach 100% on Chinese Platforms; Battery Cells Stay Untariffed** — [Source](<https://www.techtimes.com/articles/324566/20260815/drone-tariff-rally-hits-engineering-wall-magnets-batteries-stay-china-made.htm>) — Published 2026-08-21

Platform tariffs without cell tariffs widen the gap between policy intent and actual supply chain exposure.

- **White House Drone Dominance Meeting Surfaces 60,000-Unit Order and $820M Conditional Loan** — [Source](<https://dronexl.co/2026/08/20/white-house-drone-dominance-industry-meeting/>) — Published 2026-08-21

Forty drone makers convened as Section 232 deadline and Beijing retaliation risk frame the demand signal.

- **DLA Cancels $300M Lithium Carbonate Stockpile Tender After Two Deadline Extensions** — [Source](<https://finance.yahoo.com/energy/articles/us-defense-agency-cancels-plan-065342178.html>) — Published 2026-08-21

Second strategic mineral stockpile procurement failure in two years. 16,170 MT solicitation withdrawn outright.

- **Section 232 Drone Tariff Compliance: Allied-Nation Rates and 180-Day Blue UAS Grace Period** — [Source](<https://www.gtlaw.com/en/insights/2026/8/president-trump-sets-new-drone-section-232-tariffs>) — Published 2026-08-21

Tiered preferential rates for allied nations and delayed Blue UAS effective date create structured compliance pathways.

- **Sila Receives $1.4B OSC Conditional Loan for Silicon-Anode and Cell Manufacturing Scale-Up** — [Source](<https://techcrunch.com/2026/08/10/sila-lands-1-4b-pentagon-loan-as-militaries-demand-more-batteries/>) — Published 2026-08-21

Pentagon financing without a disclosed defense production contract. Moses Lake anode expansion and new cell facility.

### [Qualification](<https://anchor.is/the-hysteresis/issue/11/qualification/markdown>)

Pack-level requirements, test conditions, and standards by application

- [The Standards Map — Humanoid Robotics Pack Qualification, Q3 2026 Update](<https://anchor.is/the-hysteresis/issue/11/qualification/article/35779/markdown>) — By [Ronan Adike](<https://anchor.is/the-hysteresis/team/74/markdown>) · Published 2026-08-21 · Format: The Standards Map

Four adjacent-framework documents updated this quarter. UL 2595 Ed 3 raised its voltage ceiling from 75 Vdc to 250 Vdc, which brings most humanoid pack architectures inside its stated scope for the first time. ISO 18646-5:2026 standardizes legged-robot locomotion test methods and contains no battery parameter, though it supplies useful structure for anchoring duty-cycle definition. UL 3300 revised whole-machine moisture and stability clauses. UN 38.3 Rev 8 Am 1 is a citation update. None of it closes the pack-qualification gap: every DVP row in the gaps table remains program-defined, and ISO 13482 Edition 2 has been at FDIS since July 2025.

- **UL 3300 Ed 1 Revision Adds AI Safety** — [Source](<https://www.shopulstandards.com/ProductDetail.aspx?ShowFreeviewModal=1&UniqueKey=46468>) — Published 2026-08-21

UL 3300, Edition 1 revision, 14 August 2026. Adds AI-based safety function validation (new sections 8.4.5, 8.15), remote-pendant controller scope, and revised moisture/occlusion clauses. Obstacle test realigned to ISO 18646-2; prior Tables 2 and 3 deleted. DVP rows citing pre-revision obstacle test parameters and table references require update. Does not change mechanical hazard or battery-specific clauses.

- **UL 2595 Edition 3 Replaces Prior Appliance Baseline** — [Source](<https://www.shopulstandards.com/ProductDetail.aspx?productId=UL2595>) — Published 2026-08-21

UL 2595, Edition 3, 10 July 2026. Full edition replacement, not incremental revision. Section 1.8 states IEC 62133-2 and UL 1642 alone are insufficient for appliance-level evaluation. UL 3300 now cross-references Edition 3. DVP entries citing Edition 2 clause numbers need re-verification against licensed Edition 3 text. Does not alter the underlying IEC 62133-2 or UL 1642 requirements themselves.

- **FAA Accepts ASTM F3830-26 for Part 22 EESS** — [Source](<https://regulations.justia.com/regulations/fedreg/2026/07/16/2026-14298.html>) — Published 2026-08-21

ASTM F3830-26, FAA-accepted effective 24 July 2026 under Part 22 MOSAIC. Provides the EESS qualification path for light-sport propulsion batteries. Integration standard is ASTM F3840-26. DVP programs targeting this lane need controlled ASTM text for clause-level thresholds. Does not apply to powered-lift type certification under AC 21.17-4; that remains a separate path.

- **EASA Consolidates SORA 2.5 in June 2026 Rules** — [Source](<https://www.easa.europa.eu/en/newsroom-and-events/news/easa-published-revision-june-2026-easy-access-rules-unmanned-aircraft-systems>) — Published 2026-08-21

EASA Easy Access Rules for UAS, June 2026 edition, incorporating SORA 2.5 (ED Decision 2025/018/R). Governs specific-category operational authorization methodology. Member State transition windows from SORA 2.0 vary; some have closed. Update edition references in program documentation. Does not introduce or modify pack-level test criteria; battery qualification requirements are unchanged.

- **GB/T 46460-2025 First Chinese UAS Battery Standard** — [Source](<https://openstd.samr.gov.cn/bzgk/std/newGbInfo?hcno=9E28CD95CCD6161D200CC0C2DABA832F>) — Published 2026-08-21

GB/T 46460-2025, effective 1 May 2026. First dedicated Chinese national standard for lithium-ion cells and batteries in unmanned aircraft. Creates a distinct compliance lane from ASTM F3005-22 and ISO 24352:2023. DVP programs with China market exposure need this added as a governing document. Clause-level thresholds require controlled GB/T text; publicly available metadata is locator-grade only. Does not supersede or modify ASTM or ISO UAS battery standards.

- **UN 38.3 Amendment 1 Revises Rupture Test Definition** — [Source](<https://unece.org/transport/dangerous-goods/rev8-files>) — Published 2026-08-21

UN 38.3, Eighth Revised Edition, Amendment 1, published September 2025. Expands the disassembly definition to permit alternatives to the metal screen test where equivalence is demonstrated. Adds restructured test tables organized by device type. All DVP rows citing UN 38.3 should update version references to Eighth Revised Edition, Amendment 1. Does not change the core test sequence or pass/fail criteria for cells and batteries.

- **ABS January 2026 Rules: No Battery Section Change** — [Source](<https://ww2.eagle.org/content/dam/eagle/rules-and-resources/RuleManager2/notices/january-2026/7-uwvs_nandgi-jan26.pdf>) — Published 2026-08-21

ABS Rules for Underwater Vehicles, January 2026 edition, effective 1 January 2026. The change notice does not list sections 10/11.5 (lithium battery and BMS clauses) as revised. Update the program-selected edition field in your DVP. Verify against controlled rule text before freezing. Battery and BMS qualification requirements unchanged from prior edition.

- **ISO 18646-5 First Legged Locomotion Performance Standard Published** — [Source](<https://www.iso.org/standard/86850.html>) — Published 2026-08-21

ISO 18646-5, published July 2026. First standard specifying locomotion performance test methods for legged robots, including bipedal humanoids. ISO explicitly states these are not safety verification tests. Useful as a design-input source for duty-cycle and power-pulse DVP entries; label as performance reference, not qualification requirement. Does not establish safety, abuse, or battery qualification criteria.

- **Battery Thermal Runaway in eVTOL Aircraft: Risks, Mitigations, and Firefighting Strategies (CAP3203)** — [Source](<https://www.caa.co.uk/publication/download/26578>) — Published 2026-08-21

UK CAA-commissioned study (WMG/University of Warwick, December 2025) under the Future of Flight Programme. Concludes that no validated RFFS methods exist for eVTOL Li-ion thermal runaway, that DO-311A scope excludes propulsion-scale packs, and that road-EV fire evidence does not transfer to eVTOL operating profiles with high landing SOC (30-40%) and rapid turnaround charging. Informational publication, not regulatory guidance.

- **Powering Humanoid Robots: The Central Role of Battery Technology** — [Source](<https://www.the-innovation.org/data/article/energy-use/preview/pdf/EU-2026-0002.pdf>) — Published 2026-08-21

Published in The Innovation Energy & Use (2026). Quantifies humanoid pack constraints: 5-8 kg mass budget for a ~70 kg platform, 3-5C peak discharge, 48-58 V nominal voltage borrowed from industrial domains, operating range of -40 to 60 degrees C. Authors call explicitly for industry standards and safety certification as a prerequisite for commercialization. All values are analysis-derived.

- [Part 22 Light-Sport Powered-Lift and the Battery Standard That Governs It](<https://anchor.is/the-hysteresis/issue/11/qualification/article/35769/markdown>) — By [Ronan Adike](<https://anchor.is/the-hysteresis/team/74/markdown>) · Published 2026-08-21

14 CFR Part 22, effective July 24, 2026 under the [MOSAIC final rule](https://www.faa.gov/aircraft/MOSAIC), created a light-sport powered-lift category that operates on manufacturer self-certification. The FAA issues no type certificate and conducts no bilateral MOC negotiation. The manufacturer signs a statement of compliance (FAA Form 8130-15) attesting conformance with FAA-accepted ASTM consensus standards.

- **EASA SC-VTOL Document Library — MOC-3, MOC-4, MOC-5 Propulsion Battery Test Requirements** — [Source](<https://www.easa.europa.eu/en/document-library/product-certification-consultations/special-condition-vtol>) — Published 2026-08-21

Free PDFs. Current MOC documents for eVTOL propulsion battery safety and qualification testing.

- **FAA AC 21.17-4 — Powered-Lift Type Certification Guidance (July 2025)** — [Source](<https://www.faa.gov/documentLibrary/media/Advisory_Circular/AC_21.17-4.pdf>) — Published 2026-08-21

Free PDF. U.S. energy-system safety outcomes framework; pack-level MOC remains applicant-proposed.

- **UL 3300 Edition 1 — Robotics Safety Standard (Revised 14 August 2026)** — [Source](<https://www.shopulstandards.com/ProductDetail.aspx?ShowFreeviewModal=1&UniqueKey=46468>) — Published 2026-08-21

Paywalled. Latest revision adds stability, obstacle, and AI safety tests. References UL 2595 for battery provisions.

- **ABS Rules for Underwater Vehicles — Battery Certification and Pressure-Test Clauses** — [Source](<https://ww2.eagle.org/content/dam/eagle/rules-and-guides/current/special_service/7-rules-for-building-and-classing-underwater-vehicles%2C-systems-and-hyperbaric-facilities-2025/7-uwvs-rules-jan25.pdf>) — Published 2026-08-21

Free PDF. Sections 10/11.5 cover UUV battery certification entry, BMS functions, pressure testing.

- **UN Manual of Tests and Criteria Rev.8 + Amendment 1 (2025) — Section 38.3** — [Source](<https://unece.org/transport/publications/un-manual-tests-and-criteria-rev8-2023-and-amendment-1-2025>) — Published 2026-08-21

Free PDFs. Transport-test baseline across applications. Amendment 1 revises 38.3 and rupture definition.

- **FAA Part 22 — Light-Sport Powered-Lift and Multicopter Certification (Effective July 2026)** — [Source](<https://www.faa.gov/aircraft/gen_av/light_sport>) — Published 2026-08-21

Free access. Lists FAA-accepted ASTM consensus standards for light-sport powered-lift certification.

## More

- [Publication guide](<https://anchor.is/the-hysteresis/llms.txt>)
- [Issue archive](<https://anchor.is/the-hysteresis/issues/markdown>)
