
Subsea and UUV Pack Qualification: Governed Rows and Named Voids

ABS governs lithium battery installation in underwater vehicles down to the subclause: pre-installation risk analysis, an enumerated set of BMS protection functions, third-party cell certification, pressure testing to design depth, vehicle trials. It never puts a value on any of it. The most consequential clause on this card, §10/11.5.6(a), contains exactly one number, and that number is the one-atmosphere applicability trigger. What follows extracts every published requirement in the lane, sorts the missing values into the ones your program owes and the ones nobody has written, and names the largest void: propagation under external hydrostatic pressure. It also corrects Issue #6.

Subsea and UUV Pack Qualification: Governed Rows and Named Voids
ABS governs lithium battery installation in underwater vehicles down to the subclause: pre-installation risk analysis, an enumerated set of BMS protection functions, third-party cell certification, pressure testing to design depth, vehicle trials. It never puts a value on any of it. The most consequential clause on this card, §10/11.5.6(a), contains exactly one number, and that number is the one-atmosphere applicability trigger. What follows extracts every published requirement in the lane, sorts the missing values into the ones your program owes and the ones nobody has written, and names the largest void: propagation under external hydrostatic pressure. It also corrects Issue #6.
Pressure Architecture Study
A Novel Pressure Compensated Structure of Lithium-Ion Battery Pack for Deep-Sea Autonomous Underwater Vehicle
No qualification thresholds, no cycle-life data under pressure, no safety outcomes. Acceptance criteria must still originate from ABS §10/11.5.6 or program specification.
Architecture trade-off data spanning the full 300–6,000 m envelope, useful for housing concept selection before a program freezes design depth.
Pressure Architecture Study
Review of Energy Technologies for Unmanned Underwater Vehicles
Tier 3 analysis-derived figures from a peer-reviewed review. Engineers should pull the Li et al. primary text before committing any DVP row.
2,000 m is identified as the critical depth where rigid-hull structural mass sharply erodes payload capacity and system-level specific energy.



